RCAC
- Renovations to finishes, new computer work stations, combining two office spaces
ALLA FAMIGLIA RESTAURANT
- Expansion of existing restaurant via renovations to adjacent building. Expansion to include additional dining, ball room, and upstairs bar
1865 MAIN LLC
- Renovation of existing warehouse space into car showroom, storage, service bay, and wash facilities
RIVERVIEW COMMUNITY ACTION CORP
-Creation of mezzanine for two new office spaces; related stair construction as well as ADA upgrades
ALPINE METAL TECH
-Preconstruction/Construction Management services for new 30,000sf facility
DR. LARRY SUHER PROFESSIONAL BUILDING
-Conversion of existing office space into a 3 chair dental treatment suite, sterilization room and receptionist/waiting area
117 STRATFORD AVE
-Demolition of existing and new construction of a multi-resident Trex deck, railing and concrete stairs
BIG EASY VET & DOG DAZE CAFE
-Renovation of an existing 15,000sf warehouse space into 5,000sf of Veterinary Clinic and Cafe, 5,000sf dog day care and 5,000sf of boarding
CARNEGIE ROBOTICS
-Construction of Corten, Aluminum Siding and Curtainwall to enclose 2nd floor Office Spaces
TWIN PINE ROAD
-Construction of a residential Trex deck, railing and stairs
CONSPEC-CONTROLS, INC.
-Renovations to existing 8,500 sf office and warehouse.
MHF SERVICES.
-Renovations to existing office space.
CHAPEL HARBOR AT THE WATER.
-Manage completion of a 37-acre mixed use community in the Township of O'Hara.
SIEMENS INDUSTRY, INC.
-Interior Renovations and Conversion of 9,000 sf of Production Space to NWOW Office Layout.
-Created conference rooms and office renovations.
-Installation of patio, ADA picnic table, ADA Smoking Shelter
-Created three new offices in HV1 Facility.
-Carpet tile replacement.
-GEN IV Flowline construction in Production Area.
-Install 500lb capacity jib cranes.
-Rail protection at Miles Warehouse.
-Installation of Cooler Pad.
CBRE-SIEMENS REAL ESTATE
-Conversion of 2 Offices into 4 Offices to accommodate growth.
-Renovations to 5 Conference rooms for tele/data upgrades.
-Exterior door replacement and concrete curb repairs.
-Renovations to Penn Hall Break Room and Conference Area.
-Installation of concrete pad and smoking shelter at HV-2.
-Renovations to Men and Women Restrooms, new ceramic tile on walls and floors, new casework and toilet partitions.
AEROTECH, INC.
-Owners Representative for Phase 5A and Phase 5B Addition projects.
-Renovations to existing office and training center.
-Mechanical Equipment Pad installation.
-Driveway and patio concrete replacement.
-Construction of oversized door in existing masonry for equipment.
-Phase 5C construction of new Metrology and Clean Rooms
-Phase 5D construction and alterations to conference rooms and offices
-Installation of Mechanical Equipment Pad.
-New Customer Lounge Area.
-Construction Consultant for new manufacturing facility in Germany.
COGO'S INC.
-Installation of concrete pads for Dunbar safes at multiple locations.
-Full ceiling tile replacement at multiple locations.
DR. LARRY SUHER PROFESSIONAL BUILDING
-Remove and replace brick piers at sign and patio of building.
PACK/WALTON RESIDENCE
-Renovations to Den, Powder Rooms and Master Bath Suite.
GAIL HUNTER OFFICE/WAITING ROOM
-New walls, flooring, paint, paneling after mold and water remediation.
ZAMBRANO PROPERTIES
-Update Shadyside Apartment unit with new bathroom, kitchen, flooring and paint.
-Update Aspinwall Apartment unit with new bathrooms, lighting, kitchen flooring and paint.
DUNBAR ARMORED, INC.
-Renovations to warehouse to accommodate new vaults, truck repair and coin wraps.
-Renovations and repairs to warehouse, vault and storage areas.
GEGA, INC.
-Renovations and repairs to office and warehouse due to flooding.
-New flooring, lighting and paint in main office areas. Private conference room construction in President's office.
CIRCULATORY CENTERS OF AMERICA
-Construction of new 3500sf office in Fox Chapel.
-Construction of 2,000sf office for business office.
LASER BELLA SURGERY
-Construction of new 2000sf medical office space for laser surgery.
CHAPEL POINTE CONDOMINIUM
-Owners Representative for completion of Condominium Units and Site Improvements
SCHAEDLER YESCO DISTRIBUTORS
-Construction of new showroom and interior renovations for new Pittsburgh Distribution center
INDUSTRIAL TESTING LAB SERVICES
-Buildout of sub-leased tenant space in RIDC Park
NICK CHEVROLET
-Interior and Exterior renovations to new General Motors package
CCAC LEROY IRVIS
-Project Management of casework installation
Copyright © 2018 Construction Company MP Template - All Rights Reserved.